List of documents in order to get an approval of stand construction at the exhibitions held in Expocentr Fairgrounds on 2018

Form 1Contract between Expoconsta and Customer, with full list of the documents, which are to be allowed 45 days before the exhibition mounting for approval of the stand construction (indicated in point 2 of this contract)
Form 1AConfirmation report of the technical documentation and control of the quality of electrical works
Form 3Electrical scheme
Form 4Suspension order regulation inside the halls, if you plan it
Form 4AInformation about suspension
Form 4BPrices for the suspension
Form 5Order form for rent (with installation) of electrical equipment, if you do not have your own electrical equipment, and if Expoconsta has a possibility to provide it to the moment of your order.
From 6List of the documents, which are to be allowed for the approval of the construction of the two-storied stand, if you do it
From 6AInformation about two-storied stands
Form 6BSafety conditions for the designing and construction of one-storey ande two-storied stands at the EXPOCENTRE Fairgrounds
From 8Guarantee letter for outside stands
Package of examples

Forms 4-4a, 5 - are filled in, if customer need this service
Forms 6-6a-6b – are for two-storied stands only