Form 1 | Contract between Expoconsta and Customer, with a full list of documents that must be provided 45 days before the exhibition mounting to approve the stand construction (indicated in point 2 of this contract) |
Form 1A | Confirmation report of the technical documentation and control of the quality of electrical works |
Form D03 | Letter of equipment |
Form D04 | Letter for work passes |
Form 3 | Scheme of electrical supply |
Form 3a | Regulations for electrical work at exhibitors stands |
Form 4 | Suspension order regulation inside halls, if you plan it |
Form 4A | Information about suspension |
Form 4B | Prices for the suspension |
From 6 | List of the documents, that must be provided to approve the construction of the two-storied stand, if you do it |
From 6A | Information about two-storied stands |
Form 6B | Safety conditions for the designing and construction of one-storey and two-storied stands at the EXPOCENTRE Fairgrounds |
Form 8 | Guarantee letter for all stands |
Examples and forms of documents |
Forms 4-4a - are filled in, if customer needs this service
Forms 6-6a additionally for two-storied stands only